2019-2021
Plant Update: moving an industrial control network to Ethernet
Migrating the PLC network of an industrial site to Ethernet in two phases: design, build, testing and documentation, with a crew of casual workers, scheduled around production shutdowns.
2019
Testing and fixing the cabling of a camera system at an industrial site
Live video minutes late, cameras dropping out. Wiring, instrument and software tests, a measurement report, then a cost-effective fix: a few cables replaced and the network redesigned.
2026
Quarry camera network with a radio backbone
Cameras, IP speakers and MikroTik radio bridges at a quarry, on 6 metre poles so that mining machines over 4 metres tall don't break the link. Design, build, documentation.